WA RRAN TY65 Fleetwood Drive, Rockaway, NJ 07866Customer Service: (877) 373-3078 Email: [email protected] Hours Helpline: (443) 574-4
WWW.RSIWW.COM8 of 51 QTYFan PartsH-71Step 12H-81Step 12 QTYFan PartsH-32Step 12H-12Step 12H-22Step 12H-42Step 12H-61Step 12H-91Steps 12
WWW.RSIWW.COM9 of 51Assemble BaseMake certain the pieces are in the correct positions before securing. Carefully follow the order of assembly to ensur
IMPORTANT: Position P-2A and P-2B proles at back of greenhouse.FRONTBACKT-bolt Placement CodeT-bolts used in steps 1.4A and 1.4BT-bolts used in steps
B-8B-8B-8B-8B-5B-5B-5B-5B-5B-5B-5B-5B-5B-5B-5B-5FRONTBACKWWW.RSIWW.COM11 of 51Make certain side profiles are straight and flush. Adjust position of T-
Prole QTYF-1 1156”PanelQTYW-11024” x 57”PanelQTYW-1124” x 57”W-1W-1F-7spacer toolF-1Prole QTYF-7 156”ConnectorsQTYB-3 2S-2C 4S-7 2ConnectorsQTYB-3
Prole QTYF-7 156”ConnectorsQTYB-3 2S-2C 4S-7 2PanelQTYW-1124” x 57”WWW.RSIWW.COM13 of 51NOTE: VIEW FROM OUTSIDE.2.3Remove plastic film and add the l
WWW.RSIWW.COM14 of 51Place one T-bolt on the inside bolt track of the gutter at each end. Hand tighten both T-bolts to hold in place.2.5BNOTE: VIEW F
WWW.RSIWW.COM15 of 51B-3B-5B-3F-7G-1G-2F-1W-1W-1B-5NOTE: VIEWS FROM OUTSIDE UNDER GUTTER.NOTE: VIEWS FROM OUTSIDE UNDER GUTTER.NOTE: The bottom of B-3
W-1W-1F-7spacer toolF-83.1DRemove plastic film and fit the W-7 panel into channel in base and F-8 profile. Position F-1 profile so that panel fits in
QTYConnectorB-3S-2CS-724256”QTYProleF-7 1Panel QTYW-1 124” x 57”3.1eRemove plastic film and fit another W-1 panel and fit into channel in base and F
Thank you for choosing the Monticello Greenhouse ProgramThank You for your PurchaseWe want to thank you for your purchase of the Monticello Greenhouse
F-10F-8W- 7W-1W-1F-1W- 1W- 7F-10F-8W- 1F-7F-1WWW.RSIWW.COM18 of 513.4APlace F-10 profile on W-7 panel. Make sure profile fits snugly between F-8 back
WWW.RSIWW.COM19 of 51F-6F-10F-8W-7W-9W-1W-1F-1F-10F-10F-6F-7F-10F-10F-1F-8W-1W-13.5AThe two sets of F-6 and F-10 profiles fit on top of W-1 panels. Li
WWW.RSIWW.COM20 of 51Assemble Left WallMake certain the pieces are in the correct positions before securing. Carefully follow the order of assembly to
WWW.RSIWW.COM21 of 51G-1G-1G-2G-2G-2G-2G-2NOTE: VIEWS FROM INSIDE.NOTE: VIEW FROM INSIDE.NOTE: At front and back, edge of G-1 gutter profile lines up
WWW.RSIWW.COM22 of 51NOTE: VIEWS FROM OUTSIDE UNDER GUTTER.NOTE: VIEWS FROM OUTSIDE UNDER GUTTER.NOTE: The bottom of B-3 connector extends past the ed
WWW.RSIWW.COM23 of 51NOTE: The door frame is 69¼” from the base. To avoid adjusting the placement after assembly, prepare door frame using the exact m
WWW.RSIWW.COM24 of 51NOTE: VIEWS FROM INSIDE.NOTE: VIEWS FROM INSIDE.NOTE: VIEW FROM INSIDE.NOTE: Panels will not fit completely to end of channels. T
WWW.RSIWW.COM25 of 51NOTE: VIEWS FROM INSIDE.NOTE: VIEWS FROM INSIDE.NOTE: VIEW FROM INSIDE.NOTE: Panels will not fit completely to end of channels. T
B-2S-2CS-2D 81S-7 6ConnectorQTYConnectorQTYS-2A 2S-2B 22D-7 1ProleQTYF-5F-4 1117¼”47 ¼”WWW.RSIWW.COM26 of 51IMPORTANT: F-4 profile is centered to F-5
WWW.RSIWW.COM27 of 51IMPORTANT: Bolt track of F-6 front profile is lower than bolt track of G-1 gutter profile.WARNING: The corners of W-3 panels are
WWW.RSIWW.COM1 of 51MONTICELLO Limited Warranty/ Liability Snow Load & Wind Load Warranty & LiabilityThe Monticello Greenhouse described in th
WWW.RSIWW.COM28 of 51NOTE: VIEW FROM OUTSIDE.NOTE: VIEW FROM OUTSIDE.From outside fit F-7 profiles into each side of front. Begin with either side. Ar
WWW.RSIWW.COM29 of 51B-1B-1F-10F-10F-8B-1F-8F-2F-1NOTE: VIEWS FROM OUTSIDE.IMPORTANT: Bolt track of F-6 front profile is lower than bolt track of G-1
WWW.RSIWW.COM30 of 51NOTE: VIEW FROM OUTSIDE.NOTE: VIEW FROM OUTSIDE.NOTE: Panels will not fit completely to end of channels. There will be some space
WWW.RSIWW.COM31 of 51S-7S-5A 522B-55B-10 10S-2C20QTYProfile49¾”48½”R-1E4R-12Assemble Roof RidgeMake certain the pieces are in the correct positions be
WWW.RSIWW.COM32 of 51NOTE: VIEWS FROM OUTSIDE.WARNING: Use two people to install roof ridge. Place ladder in inside of greenhouse. One person will sta
WWW.RSIWW.COM33 of 51Assemble RoofMake certain the pieces are in the correct positions before securing. Carefully follow the order of assembly to ensu
WWW.RSIWW.COM34 of 51R-1F-7W-8G-1F-7W-8R-1F-7G-1W-8NOTE: VIEWS FROM OUTSIDE.NOTE: VIEWS FROM OUTSIDE.Working from back right corner, remove plastic f
WWW.RSIWW.COM35 of 51B-4S-2C 63ConnectorQTYW-8 2PanelQTY24” x 57”Connector QTYS-7 6W-8W-88.3AHold two profiles together at ridge using one B-4 connec
WWW.RSIWW.COM36 of 51W-8 3PanelQTY24” x 57”B-4S-5B 1S-2C 94ConnectorQTYConnector QTYS-7 8*NOTE: W-10 panels are installed in step 8.8 8.4A8.4DW-8W-
WWW.RSIWW.COM37 of 518.5cHold two profiles together in place at ridge using one B-4 connector. Insert two T-bolt assemblies, line up center hole with
WWW.RSIWW.COM2 of 51IntroductionThank you for purchasing the Mojave Edition MonticelloTM Greenhouse. The Monticello line is proudly made in the USA b
WWW.RSIWW.COM38 of 518.7A8.7D8.7gNOTE: VIEW FROM OUTSIDE.Remove next bungee cord and continue working from back to install section six. Remove plasti
WWW.RSIWW.COM39 of 518.8A Continue working from back to install section seven. Remove plastic film from both sides of one W-8 panel. With side marked
WWW.RSIWW.COM40 of 51G-4W-8G-1F-7C-1G-4F-7W-8G-1G-1NOTE: VIEWS FROM OUTSIDE.NOTE: VIEWS FROM OUTSIDE.NOTE: To aid in rain collection and prevent water
WWW.RSIWW.COM41 of 51Install Roof VentsMake certain the pieces are in the correct positions before securing. Carefully follow the order of assembly to
WWW.RSIWW.COM42 of 51S-1W-10S-1W-10NOTE: VIEW FROM OUTSIDE.NOTE: VIEW FROM OUTSIDE.Screw two S-1 screws through V-4 panel. Line up gripping channel on
WWW.RSIWW.COM43 of 51W-6 2PanelQTY24” x 34”D-9S-9 42ConnectorQTYQTYProle68½”E-2 1E-1 224”E-3 122¼”IMPORTANT: You are assembling a right and left doo
WWW.RSIWW.COM44 of 51W-6 2PanelQTY24” x 34”B-3 1S-9 1ConnectorQTYD-9S-9 84D-6S-10 21ConnectorQTYQTYProle68½”E-2 2E-1 224”E-3 122¼”E-2E-1E-2D-9Repeat
WWW.RSIWW.COM45 of 51NOTE: VIEW FROM OUTSIDE.NOTE: VIEWS FROM OUTSIDE.IMPORTANT: Make sure door is level. Whennecessary loosen screws holding D-8 hing
WWW.RSIWW.COM46 of 51NOTE: The S-4 screw is designed to be used with wood. When securing base to foundations made of materials other than wood, use an
WWW.RSIWW.COM47 of 51Connectors QTYS-2C 2S-72Fan QTYH-8 1Thermostat QTYH-7 1Connectors QTY44S-2DS-5BH-7Install Fan and Solar PanelMake certain the pie
WWW.RSIWW.COM3 of 51Safety AdviceGeneral Order of AssemblyTools NeededTable of Contents• The greenhouse must be positioned and fixed on a flat level
Shutter QTYH-6 1Connectors QTYS-2C 8S-7 8Shutter Parts QTYH-2 2H-1 2Tape QTYH-1010’WWW.RSIWW.COM48 of 51Working on the ground, line up holes in H-1 b
WWW.RSIWW.COM49 of 51H-4H-3H-3H-4H-912.5DInstall H-9 solar panel on H-3 profiles and secure with S-2D nut.H-9S-5DS-11S-2DS-5DS-11S-2DS-5DS-11S-2DS-5DS
WWW.RSIWW.COM50 of 51Working from inside. Drill hole through polycarbonate.12.6ANOTE: VIEW FROM INSIDE.H-912.6BConnect wires to Solar Panel. Push the
WWW.RSIWW.COM51 of 51H-7H-8Charge ControllerBattery12.6eOPTIONAL CHARGE CONTROLLER AND BATTERY: For accurate wiring using charge controller and batter
WWW.RSIWW.COM4 of 51Constructing a Wood PlatformIMPORTANT: It is very important to begin with a level surface. Check your foundation to ensure it is l
WWW.RSIWW.COM5 of 51List of PartsWARNING: Profiles with cut edges and/or drilled holes are sharp. Use extreme caution when handling.The greenhouse is
WWW.RSIWW.COM6 of 51List of Parts (continued)WARNING: Use extreme caution when handling panels with cut edges. The corners are sharp.24”68½”22¼”68½”E-
WWW.RSIWW.COM7 of 51List of Parts (continued)D-420’Step 10D-71Step 10D-84Step 5D-98Step 10D-102Step 10G-4G-4EC-1C-2V-348425Step 8Step 8Steps5,6Step 7S
Comments to this Manuals